New hydroelectric power stations & new turbines

From the planning stages through to assembly. One-stop professionalism.

Expanding hydraulic power systematically - Regenerative energy without residues and CO2 emissions

A comprehensive supply program via Francis, Kaplan and Pelton turbines as far as special residual water turbines are concerned makes it possible for us to offer the optimal solution for every location.

Everything speaks for the structured expansion of hydraulic power. It is the most efficient regenerative energy and supplies valuable base load electricity - Without residues, without raw material consumption and without CO2 emissions.

A 50-year trusting partnership and collaboration connects us with the company Kössler in Austria, as the manufacturer of the most modern turbines. Thanks to this we have been able to construct many installations in the past decades or allow them to function optimally with new turbine technology. Subsequent investments in new rotor innovations has resulted in Kössler turbines counting as among the most effective turbines globally. Our joint goal is to promote the use of hydroelectric power.

 

Kochendörfer offers the complete mechanical engineering and electric equipment required for a new turbine installation - Everything as a one-stop service. Only the interplay of all the components from turbine to generator and controls can facilitate an optimal energy yield.

 

In the process, we will already be there for you with our experience during your initial discussions and considerations. We will gladly be of assistance in an advisory capacity, be it to do a calculation on profitability or for the combined selection of the optimal, tailor-made installation technology.

 

Seeing a project through with confidence and providing consultation from placing of order, through to assembly and delivery of the installation is a matter of course for us.

News

The new Risi 3 turbine of the EW Näfel power generation plant in Switzerland

Kochendörfer is supplying and assembling in its entirety, the mechanical equipment for the new Risi 3 turbine of the EW Näfel power generation plant in Switzerland.
»read more

The Isarkraftwerk 2 power plant successfully in operation – regenerative electricity supply for Munich

After Upgrade 1 After a two-year construction phase, Kochendörfer has put into operation for the city of Munich’s municipal works, the completely upgraded Isarkraftwerk 2 power plant with four vertical Kössler-Kaplan turbines.
»read more